Page 54 - Book of Abstracts 2023
P. 54

Optimizing and improving the envelope printing printing process at a a a printing printing house in in in in in in in Kibbutz Be'eri
IEM-4-3
By: Mordechay Mirilashvili mordi582@gmail com com Omer Weiss waisomer06@gmail com Advisor: Ms Natalya Gershon
Shamoon College of Engineering Beer-Sheva
This project analyzed the the the the feasibility of of modifying the the the the "Hamatafit" "Hamatafit" printing printing process in in in in in in the the the the "Hamatafit" "Hamatafit" department of of of the the the the the "Dfus Be'eri" printing printing house The study evaluated employee efficiency and and workload and and the the the time required to to print print a a a a a a a a a a a a a a a a single set of of products using a a a a a a a a a a a a a a a a semi- automated approach Through product product product product sampling the the the project developed predictive models for different product product product types based on
on
the the the lower error measure rate The production line was optimized by reducing the the the number of "Hamatafit" models models from 6 to to to 4 incorporating low-demand models models into existing ones and and improving operational efficiency An appropriate inventory policy based on
on
on
the the EOQ model was also proposed Keywords: forecasts inventory management work sample
Locating the bottleneck in in a a a a a a production process at at Shaniv Paper Factory
IEM-4-4
By: Ahzaie Moore azahie@gmail com com Amit Lipner amitlipner5@gmail com com Advisor: Ms Natalia Gershon
Shamoon College of Engineering Beer-Sheva
This Project involved examining investigating and identifying an an an an existing bottleneck in in in in in in in in in in in in the the the the the production line at at at the the the the the "Shaniv" plant calculating the the the the the workload imposed on
on
on
the the the the the workers and determining their efficiency We allocated time for production of of a a a a a a a a a a a a a a a pallet of of a a a a a a a a a a a a a a a final product product carried out mechanically and manually using using the the work sampling method To locate the the the the bottleneck we we built a a a a a a a a a a a a a a simulation using using Arena software that describes the the the the the production line then we we performed statistical inference tests that analyze the the the the results of the the the the simulation before and after changes The factory's inventory policy which advocates holding safety stock in in in large quantities was also reviewed Keywords: inventory policy simulation statistical inference work sampling 54

















































































   52   53   54   55   56