Page 154 - Facilities Master Plan 2016
P. 154
SPACE DIAGRAM
• Provide a high flexible space for
collaboration and multimodel learning. DATA / CTRL.
200 SF EQUIP. STOR.
• Provide ubiquitous access to mobile TECH. DIR. OFF. 200 SF
technologies. 200 SF
WORK ROOM
• Provide spaces for the display of student 200 SF
work and revolving thematic displays.
INNOV.
• Provide a clear “line of sight” to all student CONF. LAB
areas for supervision. TABLE / CHAIR 150 SF 1,200 SF
STOR. CONF. CATALOG
600 SF
• Provide a dedicated space for the 200 SF 150 SF READING
community and parents to work and prep CONF. ROOM STACKS
for activities. 150 SF
STUDENT 1,800 SF 1,800 SF
UNION REF.
6,000 SF CIRC. STACKS
400 SF
150 SF
OFF. BOOK
STORE WORK 125 SF
400 SF 300 SF STORAGE
ASB 1,200 SF
960 SF
T
75 SF
STUDENT UNION
Space Program
Student Union Library
(1) Student Collaboration 6,000 SF (1) Reading Room 1,800 SF NOTE: The square footages above are
(1) Table / Chair Storage 200 SF (1) Innovation Lab 1,200 SF net areas to assist in developing new or
(1) Store 400 SF (1) Stacks 1,800 SF reconfiguring existing floor plan layouts. The
(1) ASB 960 SF (1) Reference Stacks 400 SF final plan layout will include circulation factors
to achieve the gross square footage. This
(1) Technical Director 200 SF (1) Catalog 600 SF figure will vary depending upon the layout
(1) Work Room 200 SF (3) Conference 450 SF of the building (single story or multistory)
(1) Equipment Storage 200 SF (1) Circulation 150 SF and type of program spaces. Refer to
DESIGN OBJECTIVES (1) Data / Control 200 SF (1) Office 125 SF the individual school Implementation Plan
diagrams for specific program improvements
300 SF
(1) Workroom
(1) Book Storage 1,200 SF and the cost estimates for square footage
takeoffs (circulation factor included).
(1) Restroom 75 SF
3.4 EDUCATIONAL VISION DOCUMENT Total 16,535 SF Facilities Master Plan 113
STUDENT UNION Lodi Unified School District