Page 162 - Facilities Master Plan 2016
P. 162
• Master Plan Cost Summary
Includes a breakdown of the overall
costs for the proposed facilities
improvements by scope category.
• Existing Site Diagram(s)
Indicates existing building placement,
MASTER PLAN hardscape and landscape areas. In
COST SUMMARY addition, the existing site diagram
indicates relevant program spaces,
adjacencies and current uses.
• Conceptual Site Diagram(s)
Includes conceptual building
LEGEND placement, as well as hardscape
and landscape reconfiguration,
DIAGRAM OF if needed. The conceptual site
EXISTING diagram notes proposed new
CONDITIONS
construction, reconfiguration of
TEACHING existing spaces and modernization
of existing spaces, where eligible,
to the standards outlined in the
Facilities Master Plan.
LEGEND
DIAGRAM OF
PROPOSED
CONDITIONS
TEACHING
STATION
COUNT
* It should be noted that estimates are in 2016 dollars inclusive of both hard construction and project soft costs. Once an implementation
schedule for a project has been determined appropriate escalation to the proposed mid-point of construction should be budgeted.
5.1 EXISTING CONDITIONS ASSESSMENT Facilities Master Plan 163
OVERVIEW OF CONTENTS Lodi Unified School District