Page 163 - Facilities Master Plan 2016
P. 163
• Some clocks need to be replaced
• Backflow repairs are needed
• Irrigation improvements are needed
• Fields need to be regraded
• Additional security cameras are needed
• Universal gate locks are needed
• Repairs due to settlement (ex: cracks,
doors, dragging) issues need to be
addressed
• Repair gate near kindergarten
• A garden is desired
• Landscape improvements are needed
• ‘Right Turn Only’ signage is desired out
of the main parking lot
Notes from Maintenance & Operations:
• Replace all portable ramps/stairs
• Interior and exterior painting and flooring
• Common areas (restrooms, libraries,
9275 Glacier Point Drive, Stockton, CA 95212 etc.) need specialized access control
• More custodian storage
EXISTING SITE INFORMATION CONDITION ASSESSMENT • Dumpster enclosures for 4 dumpsters
• Upgrade EMS
Year Built: 2004 Recently Completed Work: • Portables need siding repaired
Site Acreage: 11.5 acres • Re-key doors
• New building signage • Recaulk windows
Student Population (2014-2015): 766 • New security cameras • New booster pump needed
Grade Levels: K-6 • New card entry system
• New exit gate near P-8
Total Number of Classrooms: 37
Number of Portables: 8
Notes/Comments from School Site:
• New exterior and interior paint is needed
• Classroom flooring needs to be replaced
• MPR flooring needs to be replaced
5.21 EXISTING CONDITIONS ASSESSMENT Facilities Master Plan 164
ANSEL ADAMS ES Lodi Unified School District