ELEMENTARY SCHOOLS                                                                                         LOADING STANDARDS
                                                                                           As  a result of visioning  meetings and District  stakeholder
          Kindergarten Classrooms                                                          input, the following planning assumptions were made at each
          As part of the master plan proposals, Kindergarten is planned as an all-day program at each   campus to ensure parity between school sites.
          elementary and K-8 site.  Kindergarten classrooms will be reconfigured or newly constructed
          depending on site constraints and organization to comply with the California Department   All  school  sites were planned for  the projected enrollment
          of Education’s recommendations.  Each classroom will have access to student restrooms   during the 2025/2026 school year.  For additional information
          and a shared work space for teachers, for a total of 1,350 square feet.  Additionally, the   about the demographics study, refer to Section 2.4.
          kindergarten play area will be appropriately separated from the rest of the campus with a
          secure fence and will have 1200 square feet of dedicated shade.                  The following loading standards (per classroom) were used for
                                                                                           planning purposes:
          Learning Center (LC) & Resource Specialists (RSP)
          A Learning Center is included at each site.  The Learning Center is comprised of a Speech   TK and Kindergarten      24 students
          Pathologist’s office, a Psychologist’s office, an IEP conference room, a flex office and a small   1st - 3rd Grade        24 students
          group area.  These program spaces total 1,100 square feet.                       4th - 6th Grade              30 students
                                                                                           7th - 12th Grade             31 students
          The Learning Center is ideally located near administration or central to the campus where it
          is readily accessible to students.  It is intended to provide flexibility to support programs that
          have changing populations of students that need small group space.

          Adjacent to the Learning Center is a 480 square foot Resource Specialist (RSP) room.  By
          collocating these two functions, two small group spaces are readily available for use.

          Project-Based Learning
          An Art/Science Lab and a Maker Space are included at each site to promote project-based
          learning.  Each of these classrooms will have 200 square feet of dedicated storage.

          Music Classroom
          A 1200 square foot Art/Science Lab and a 1200 square foot Maker Space are included at
          each site to promote project-based learning.  Each of these classrooms will have 200 square
          feet of dedicated storage.

          Innovation Lab
          Each site will have one 1200 square foot Innovation Lab adjacent to the Library/Media Center.
          This space is a technology-rich computer-based space.  As the educational environment
          transitions toward one-to-one student device atmospheres, the purpose of this room may
          transition over time.



         2.3       PLANNING & CONSIDERATIONS                                                                                   Facilities Master Plan  20
                   PLANNING ASSUMPTIONS                                                                                    Lodi Unified School District
   15   16   17   18   19   20   21   22   23   24   25