Page 677 - Facilities Master Plan 2016
P. 677

Lodi Unified School District                                            Lodi Unified School District
          Tokay High School                                                       Henderson Community Day Middle School
          Facilities Master Plan - Total Program Cost                             Facilities Master Plan - Total Program Cost
          Opinion of Probable Cost                                     19-Apr-16  Opinion of Probable Cost                                    19-Apr-16
                             Project Cost Summary (2016$) - Tokay High School                Project Cost Summary (2016$) - Henderson Community Day Middle School
                                                       Construction Costs   Total Project                                      Construction Costs   Total Project
          Item                       Quantity  Unit  Unit Cost  Subtotal  Total  Cost 25% (x 1.33)  Item    Quantity  Unit  Unit Cost  Subtotal  Total  Cost 25% (x 1.33)
           15 Exterior Play Spaces, Playfields & Hardcourts  $                       -  $                             -  01 Modernize & Reconfigure Aging Classrooms  $                       -  $                             -
            15b PE Play Yard & Hardcourts                                          1b Replacement or repair of walls
            15b.4 Shade Structure                  3,600 sf  $               90.00  1b.2 Repair walls                     1,920 sf  $               12.60
            15b.6 New Hardcourts                22,625 sf  $               11.00   1c Replacement or repair of windows
            15b.8 Basketball Court/Sports Equipment                        1 ls  $       38,000.00  1c.1 Replace windows                1,920 sf  $               18.00
            15c Playfields                                                         1d Replacement or repair of doors (other than safety locks
            15c.1 Repair Playfields           162,025 sf  $                 3.00   @ classroom doors)
            15d Baseball/Softball Fields                                            1d.1 Replace doors & hardware                1,920 sf  $               13.50
            15d.1 Baseball field - natural turf           285,600 sf  $                 9.75  1e Replacement or repair of floors
            15d.3 Pitching mound/bases, per field                        1 ea  $       22,000.00  1e.1 Replace floors                1,920 sf  $               14.40
            15d.4 Backstops, per field                        1 ea  $       27,000.00  1f Replacement or repair of ceilings
            15d.5 Dugouts, per field                        1 ea  $       81,000.00  1f.1 Replace ceilings                1,920 sf  $               27.00
            15d.6 Scoreboards                              1 ea  $       63,000.00  1g Patch & Paint Interior/Exterior
            15f Stadium Bleachers                                                   1g.1 Patch & paint interior                1,920 sf  $                 3.10
            15f.1 Repair Aluminum Bleachers                        1 ls  $     300,000.00  1g.2 Patch & paint exterior                1,920 sf  $                 4.50
            15f.2 New Pressbox                        300 sf  $             395.00  1I Exterior Façade Enhancement                6,880 sf  $               63.00
            15g Field Structures                                                   1o Replace Existing Roofing             12,298 sf  $               20.93
            15g1 Field House Team Rooms                1,969 sf  $             494.00  1p Repair Existing Covered Walkways / Hallways                2,060 sf  $               13.00
            15g2 Concessions                          330 sf  $             521.00
             15m Tennis Courts                             8 ea  $     243,000.00
            15n Aquatic complex                                                   02 Existing Building Systems & Toilets          $                       -  $                             -
            15n.1 Repair Pool deck              21,250 sf  $               14.00   2a HVAC system upgrades                1,920 sf  $               29.00
            15n.5 Shade Structure                  2,400 sf  $               90.00
                                                                                   2b Lighting upgrades - new interior lighting & controls                1,920 sf  $               15.00
                                                                                   2c Electrical upgrades
           16 Next Generation Classroom Flexibility (Furniture)  $                       -  $                             -  2c.1 Upgrade electrical wiring & increase electrical
            16a Flexible furniture (Per Classroom, Direct Cost)                     10 ea  $       15,000.00  outlets                1,920 sf  $                 9.00
                                                                                   2d Plumbing system upgrades                1,920 sf  $               11.00
                                                                                   2e Replace aging plumbing, upgrade and/or expand
                                                                                   restroom facilities
           17 Technology Infrastructure                    $                       -  $                             -
            Not included in this Facilities Needs Assessment                        2e.2 Reconfigure Existing Restroom                   360 sf  $             222.00
                                                                                   2f Energy-efficient building systems and controls (EMS
                                                                                   system, per sf of Bldg)                1,920 sf  $                 7.20
          Total Construction/Project Cost (2016$)          $         48,760,000  $64,851,000
                                                                                  03 Site Utilities                               $                       -  $                             -
                                                                                   (For entire campus and site)
          The following items are excluded from this budget:                       3a Updated gas service lines           277,477 sf  $                 0.32
           Utility hook-up fees & City connection fees.                            3b Updated sewer service lines           277,477 sf  $                 0.53
           Offsite work and traffic signals.                                       3c Updated water service lines           277,477 sf  $                 0.68
           Land acquisition costs.                                                 3d Updated electrical mains and distribution           277,477 sf  $                 0.90
           Hazardous material surveys, abatement, and disposal.                    3e Updated storm drainage system           277,477 sf  $                 0.68
           Escalation (Costs are in 2016$ calculated to the end of the year).
                                                                                   3f Electrical Capacity Upgrades                        1 ls  $     230,000.00


         Prepared by: LPA, Inc. / Cumming                                        Prepared by: LPA, Inc. / Cumming


         6.3       APPENDIX                                                                                                    Facilities Master Plan  648
                   DETAILED PRIORITIZED COST ESTIMATE                                                                      Lodi Unified School District
   672   673   674   675   676   677   678   679   680   681   682