Page 21 - Twin Wave Mitter™
P. 21

®
                       TWIN WAVE MITTER


                       Maintenance


                       Drive Arm / Rack Connector Bushing Replacement

                          Tools needed for installation:
                                  Power drill                            1/4” drill bit

                                  1/4” x 2-1/2” bolt or long narrow punch   Hammer
                                  Miscellaneous hand tools





                                 DISCONNECT AND LOCKOUT ELECTRICAL POWER BEFORE SERVICING ANY
                                                                EQUIPMENT!


                                                            CAUTION


                                      Always wear safety glasses when performing maintenance on any equipment

                          Parts Identification

                            Drive Arm / Rack Connector        Bushing: part #3723          Pins: part #1PIN107











































                        1MANUL763           Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681       19
   16   17   18   19   20   21   22   23   24   25   26