Page 9 - Triple Foaming Sticks
P. 9
TRIPLE FOAMING STICKS
Introduction
Before You Get Started
Tools needed for installation:
Hammer drill with 1/2” bit Work gloves
Tape measure (12 foot or greater) Tin snips
25 foot (8 meters) extension cord Safety glasses
Miscellaneous hand tools Level
Equipment included: Qty
Triple Foaming Sticks 2
Accessory Box 1
Note: Uncrate and inspect shipment for damage, and to verify that all pieces are there. If there
is any damaged equipment, file a claim with the trucking company immediately. Receiving
party is responsible for filing claim with trucking company. Notify your local distributor
or Belanger, Inc. immediately If shipment is determined damaged or incomplete.
®
Belanger, Inc. 1995
This manual and the accompanying equipment are protected by United States and International copyright and patent laws.
You may make one copy of this manual. Do not make additional copies of this manual or electronically transmit it in any form
whatsoever, in whole or in part, without the prior written permission of Belanger, Inc.
®
1MANUAL753 Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681 7