Page 12 - Triple Foaming Sticks
P. 12
TRIPLE FOAMING STICKS
Installation
Assembly
4) While placing a level on the vertical surface of one of the sticks, place shims under the base plate
as needed to make the assembly level in both directions. Repeat this leveling process on the other
stick assembly.
Note: Shims not supplied by Belanger, Inc.
5) Once both sticks assembles are positioned correctly and level, lag them to the floor using the
supplied lag bolts. Snug bolts up but DO NOT TIGHTEN THEM UNTIL STATED.
6) Replace plastic bolts.
Place level here
Place level here
10 Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681 1MANUAL753