Page 12 - Triple Foaming Sticks
P. 12

TRIPLE FOAMING STICKS


             Installation



             Assembly
                    4)  While placing a level on the vertical surface of one of the sticks, place shims under the base plate
                       as needed to make the assembly level in both directions. Repeat this leveling process on the other
                       stick assembly.
                    Note:  Shims not supplied by Belanger, Inc.

                    5)  Once both sticks assembles are  positioned  correctly and level, lag them  to the floor using the
                       supplied lag bolts. Snug bolts up but DO NOT TIGHTEN THEM UNTIL STATED.
                    6)  Replace plastic bolts.














                                                                      Place level here







                                         Place level here



































             10        Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681        1MANUAL753
   7   8   9   10   11   12   13   14   15   16   17