Page 157 - Saber® Installation & Startup
P. 157
INSTALLATION & STARTUP
Chapter 10 Spot Free Rinse (RO)
Note: The information in this portion of the document was supplied by Pur-Clean, A division of New
Wave Industries LTD. Pur-Clean equipment is designed for easy installation. However, should
you have any questions, please call New Wave Industries LTD. at (916) 978-9990 or (800) 882-
8854.
General Requirements
· Provide a covered and/or heated enclosed area with at least 30” x 72” of floor space
· Electrical, see site specific drawings
· Plumbing, see site specific drawings
· 2” drain
Utility Requirements
Requirements
23” 24” Top View
Water
· 3/4” water line with Ball
Valve, 20 GPM @ 30 PSI 36”
for RO System
· Drain
Electrical
· Two, 208/220V, 20 Amp,
single-phase circuits, each
with its own L6-20 locking
receptacle. Place this plug
60” up from the floor on the
right side of the RO unit.
72” Front View
64”
100-Gallon
Tank
Note: See site-specific plumbing layout for more details.
1MANUL290 Belanger, Inc. * PO BOX 5470 * Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681 10-1