Page 174 - Saber® Installation & Startup
P. 174

INSTALLATION & STARTUP

            Chapter 13 Signage



            Navigational Sign
                   1)  Supply 120VAC to the junction box mounted on the housing of the Navigational Sign. Refer to your electrical
                      drawings.
































               Floor Mount
                                                          The  sign  floor  mount  comes  with  a  fully
                                                          assembled  stand  that  simply  needs  to  be
                                                          secured  to  the  bottom  of  the  sign  enclosure
                                                          and  lag  stand  to  the  floor  in  the  desired  bay
                                                          location.



















             13-2   Belanger, Inc. * PO BOX 5470 * Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681    1MANUL290
   169   170   171   172   173   174   175   176   177   178   179