Page 174 - Saber® Installation & Startup
P. 174
INSTALLATION & STARTUP
Chapter 13 Signage
Navigational Sign
1) Supply 120VAC to the junction box mounted on the housing of the Navigational Sign. Refer to your electrical
drawings.
Floor Mount
The sign floor mount comes with a fully
assembled stand that simply needs to be
secured to the bottom of the sign enclosure
and lag stand to the floor in the desired bay
location.
13-2 Belanger, Inc. * PO BOX 5470 * Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681 1MANUL290