                          The Wall Manifold will have to be reconfigured using supplied components as shown below. Apply Teflon tape on all
                          fittings before installation.

                                        Base (Existing)   Pre-Soak
                                      Manifold Assembly  Fitting 2
                                                                                           Foaming Sealer Wax
                                                                                           or Foam-X Manifold
                                                                                           Assembly










                                                                    Drying Agent and
                                           Drying Agent and         Wax Fitting
                                               Wax Fitting

                          The Foam-X Option requires an additional chemical pump that will be wall mounted inside the equipment room. There
                          is also an additional water valve assembly that must be plumbed into the main water line with a field supplied tee as
                          shown below.