            Chapter 4 Trades


            Plumbing Coordination Meeting
                      ·  Do a walk-thru with the Plumber, pointing out equipment requirements & site
                          specifications
                      ·  Make sure the Plumber is familiar with our terminology

                      ·  Provide the Plumber with the Schematic
                      ·  Make this manual available to the Plumber

                      ·  Thoroughly discuss site-specific requirements
                      ·  Thoroughly  discuss  installation  material  selections  (Hose,  stainless  tubing,
                          rigid pipe, etc.)

                      ·  Discuss who is responsible for field supplied materials; such as High-pressure
                          hose assemblies
                      ·  Discuss who is responsible for final terminations.


            Penetrating the Wall for Boom Utilities
                This is where the electrical and plumbing utilities are routed from the equipment room to feed the
                boom.




                   It is critical that this task is performed correctly! There can be NO rubbing or chafing
                    in this area. The movement of the Boom is such that, unless done properly, there is a
                    good chance the utility lines will pre-maturely wear or fail in this area if they are not
                                            secured and protected properly.
                Typically the wall should be penetrated with rigid components.

                   ·   We recommend using 1-1/2” rigid or thin wall conduit to route the electrical lines
                      from the equipment room to the boom. PVC can also be used if supported
                      properly.
                   ·   3/4” stainless tubing or piping is preferred for the plumbing lines.
                An optional “Thru-Wall Plate Kit” can be purchased to assist in routing the Saber® utilities from