Page 14 - Wind Doors
P. 14

WINDDOOR


            Installation


            Lagging Frame to the Floor

                   1)  Once the equipment is properly positioned, check for level and plumb on all dimensions.
                   2)  Shim the Wind Door™ appropriately (shims not provided), drill and lag the Wind Door to the floor
                       using the 1/2-13 x 3-1/2” cement quick lag bolts provided.
                   Note:  There are a total of four 1/2” lag bolts provided (two for each leg). Install the lag bolts
                          diagonally on the detail plate.


                                                  CAUTION


                     Belanger, Inc. does not recommend the use of a Clear Wind Seal Door at exit end of facility
                    where no employee is present to assist door opening if failure occurs. This may cause damage to
                                                 vehicle and/or equipment.





















































             12        Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681       1MANUL874
   9   10   11   12   13   14   15   16   17   18   19