Page 15 - Wave Across™
P. 15

WAVE ACROSS


                       Installation


                       Tunnel Placement

                       When  placing  a  piece  of  equipment,  tunnel depth will vary from site to site. Be sure to allow an adequate operating
                       envelope. The Wave Across  can be installed facing either direction as there is no entrance or exit side.
                                           ®
                          1)  Position the assembled unit in its permanent tunnel location.
                          2)  While placing a level on the vertical surface of one of the legs, place shims under the base
                              plate as needed to make the assembly level in both directions. Repeat this leveling process
                              on the other leg.
                              Note:  Shims not supplied by Belanger, Inc.

                          3)  Once the assembly is positioned correctly and level, lag it to the floor using the supplied lag
                              bolts.









                                                              DIRECTION
                                                                  of
                                                               TRAVEL



























                                  45”                           Center
                                                                 Line




                                          The 45” dimension is taken from the inside edge of the inside conveyor guide rail to the outside edge of the equipment leg.
                                                 Although the main water feed is shown on the driver side, it can be installed on either side.









                       1MANUL850         Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681        11