Page 17 - Wave Across™
P. 17
WAVE ACROSS
Installation
Utilities
Electrical
CAUTION
It is recommended that a licensed electrician is contracted to perform all electrical
installations.
1) Supply 3-phase power to the motor on top of the frame assembly.
Overhead View
Main electrical
feed
Motor
Gearbox
1MANUL850 Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681 13