Page 16 - QuickFire® Wrap Around Mix & Match
P. 16

QUICKFIRE® WRAP AROUND


             Installation


             Tunnel Placement Overview

               When placing a piece of equipment, tunnel depth will vary from site to site. Be sure to allow an adequate operating envelope.


                                                                                12°






                                                                               33°




                                                                    33°





                                                                    12°


                The “Posi-Stops can be adjusted to decrease the rotation distance if your site has limited space.
                That will be covered later in this document.

                1)  Locate the two stand assemblies (legs) and  determine  which  is  the driver side and the
                    passenger side. See image above to assist in determination.
                    There are three traditional installation configurations for the QuickFire® Wrap Around.
                           •   Standard, stand alone
                           •   Staggered with a set of Wave Low Side Washers™
                           •   Staggered with a set of Wave Full Side Washers™
                    The three traditional configurations are shown on the following pages.

                2)  Using a forklift, position the QuickFire® Wrap Around ™ stand assembles (legs) into their

                    appropriate tunnel location as shown on the following pages.
                                                  CAUTION

                            Be sure to clamp equipment securely to the forks of the forklift.
                                 Do not stand under load while fork lift is in operation.






















              12          Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681           1MANUL825
   11   12   13   14   15   16   17   18   19   20   21