Page 21 - QuickFire® Wrap Around Mix & Match
P. 21

QUICKFIRE® WRAP AROUND


                       Installation


                       Positioning the Stands (Legs)

                              Note:  The stands will have to be leveled later during the installation, so do not pound any lag
                                     bolts down all the way into the floor. Shims may also be required in the leveling process
                                     although they are not supplied.

                          4)  After making sure the stands are square to the conveyor, drill a 5/8” hole and place one 5/8”
                              lag bolt into place as shown below. Drill the other three holes.
                                  Passenger Side Leg shown.
                                     You can tell by the larger
                                     plate surface being on the
                                     side of the Boom and the                     Lag Bolts go in the outer (non-threaded) holes
                                  angle bracket facing outward.
                                                                                  Leveling Bolts go in the inner (threaded) holes
                                       Metal plate to
                                     stabilize leveling
                                     process (typical)


                          5)  Locate the supplied 3/4-10 x 3-1/2” bolts and place them into the threaded holes of the two
                              Base-Plates. These will be used later as the “leveling Bolts”. Place a small piece of steel or
                              aluminum plate under each leveling bolt so that it doesn’t penetrate the cement floor. Steel
                              or aluminum plating is field supplied.
                          6)  Level stand both North, South, East and West
                          7)  Now that the Stands are level, pound the lags all the way down.

                          8)  Tighten the lag bolts.
                              Note:  The  stands  will need to be leveled again  after the Booms, Head Assemblies and Wash
                                     Materials are installed.



































                       1MANUL825              Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681        17