Page 15 - In-Ground Correlator
P. 15

CORRELATOR


                       Installation


                       Right-Hand Drive

                          If you have a Right-Hand Drive system, use the following images to assist in orientation and
                          installation.

                          Cross section of both pits from entrance: front view






                                                  Passenger side               Driver side


                                                             4” PVC drain to conveyor pit

                                                          (diameter of drain may vary or as required)



                          Typical Pit Plan
















































                       1MANUL100           Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681         13
   10   11   12   13   14   15   16   17   18   19   20