Page 15 - In-Ground Correlator
P. 15
CORRELATOR
Installation
Right-Hand Drive
If you have a Right-Hand Drive system, use the following images to assist in orientation and
installation.
Cross section of both pits from entrance: front view
Passenger side Driver side
4” PVC drain to conveyor pit
(diameter of drain may vary or as required)
Typical Pit Plan
1MANUL100 Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681 13