Page 13 - Auxiliary Aluminum Arch
P. 13

AUXILIARY ALUMINUM ARCH



                       Installation


                       Tunnel Placement
                       When  placing a piece of equipment, tunnel depth will vary from site to site. Be sure to allow an adequate
                       operating envelope
                              1)  Position the Single Aluminum Arch in the exact tunnel location.
                                                               Overhead View


                                                 44”


















































                                                        Position Arch appropriately according to the site Conveyor style
                                      44" dimensions are taken from the outer equipment leg to the driver side edge of the inside guide rail

                              2)  Once positioned correctly and leveled, lag the arch to floor using a hammer drill with a 1/2" bit, and
                                 the 1/2-13 x 3" quick lag bolts provided.






                       1MANUL032             Belanger , Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (810) 349-7010 * Fax (810) 380-9681        11
   8   9   10   11   12   13   14   15   16