            Remove and replace split system central air conditioner and gas furnace. Remove and dispose
            existing units. Install a pad-mounted 13 SEER compressor, 80% efficiency gas furnace and fan coil
            unit. Includes emergency condensate shut off, connection to the existing supply and return duct and
            vent, refrigeration tubing, electric disconnect and programmable thermostat.
              2 ton cooling, 71 MBtu heating                P1@12.0   Ea 3,646.10     476.00    4,122.10
              3 ton cooling, 89 MBtu heating                P1@14.0   Ea 4,595.50     555.40    5,150.90
              5 ton cooling, 107 MBtu heating               P1@14.0   Ea 5,928.70     555.40    6,484.10
              Add for SEER 16 rated compressor                     --  %      30.0         --         --
              Add for SEER 16 to 20 rating, variable speed         --  %      50.0         --         --
              Add for attic-mounted horizontal flow furnace  P1@2.00  Ea    107.06     79.34     186.40
              Add a new bedroom radiator                    P1@8.50   Ea    294.92    337.20     632.12
              Add a new dining room radiator                P1@7.50   Ea    367.64    297.50     665.14
              Add a new kitchen radiator                    P1@8.50   Ea    473.69    337.20     810.89
              Add a new living room radiator                P1@9.00   Ea    514.09    357.00     871.09
              Relocate an existing radiator                 P1@6.50   Ea     92.21    257.90     350.11
              Add for second floor installations                    --  %     20.0        --          --

            Hydronic heating for room additions. Install up to 8 feet of baseboard convection unit with necessary
            supply and return lines. Based on an average-size single room.
              First floor work, per room                    P1@9.00   Ea    887.79    357.00    1,244.79
              Second floor work, per room                   P1@11.0   Ea 1,030.20     436.40    1,466.60

            Remove and replace a cast iron radiator. Replaced on the same wall using exposed piping. Add the
            cost of refinishing floor and wall surfaces if required.
              Replace with a baseboard radiator             P1@8.00   Ea    819.11    317.40    1,136.51
              Replace with thin-line radiator               P1@8.00   Ea    810.02    317.40    1,127.42

            Remove and replace a hydronic heating system. In an existing home. Remove and haul away the
            existing heating plant. Install a new gas- or propane-fired hydronic heating boiler with insulated steel
            jacket, new wall thermostat, electrical connections and wiring. Connect to existing gas, propane or oil
            supply lines and existing hydronic distribution piping. Includes electric or spark ignition, power vent
            controls, standard valves, gauges, and drain valves. Add the cost of radiators and refinishing floor,
            ceiling and wall surfaces as required.
              Gas-fired, 100,000 Btu                        P1@26.0   Ea 3,555.20    1,031.00   4,586.20
              Gas-fired, 125,000 Btu                        P1@27.5   Ea 3,615.80    1,091.00   4,706.80
              Oil-fired, 100,000 Btu                        P1@27.0   Ea 3,979.40    1,071.00   5,050.40
              Oil-fired, 125,000 Btu                        P1@28.0   Ea 4,242.00    1,111.00   5,353.00
              Add per bathroom radiator, copper pipe        P1@7.50   Ea    515.10    297.50     812.60
              Add per bedroom radiator, copper pipe         P1@5.00   Ea    592.87    198.40     791.27
              Add per dining room radiator, copper pipe     P1@8.50   Ea    625.19    337.20     962.39
              Add per kitchen radiator, copper pipe         P1@6.00   Ea    680.74    238.00     918.74
              Add per living room radiator, copper pipe     P1@7.50   Ea    559.54    297.50     857.04
              Add per bathroom radiator, iron pipe          P1@5.00   Ea    449.45    198.40     647.85
              Add per bedroom radiator, iron pipe           P1@8.50   Ea    521.16    337.20     858.36
              Add per dining room radiator, iron pipe       P1@6.50   Ea    643.37    257.90     901.27
              Add per kitchen radiator, iron pipe           P1@9.00   Ea    568.63    357.00     925.63
              Add per living room radiator, iron pipe       P1@7.00   Ea    619.13    277.70     896.83
              Add for second floor radiators                        --  %     20.0        --          --
              Add for circulating pump                      P1@5.00   Ea    638.32    198.40     836.72

            HEPA central air filtration retrofit. 240 CFM, 0.5 inches of water column pressure differential, with
            pre-filter and activated carbon filter. 2' x 8' duct collar, gasket and hanger assembly. Add the cost of
            control and electric wiring.
              HEPA filtration module, test and balance     SW@2.00    Ea    517.12     90.66     607.78
              Cut hole in wall or roof                     SW@1.00    Ea     42.32     45.33      87.65
              Mount duct hangers                           SW@.250    Ea      4.23     11.33      15.56