Page 41 - WU183.indd
P. 41

IAAF W ORLD U18 REPORT









                          system, the PF operating systems and the tran-  2.  Confi rmation and teams Seeding during the com-
                          sponder timing.                               petition
                       d)  Cable outlet points in the rooms to allow Seiko      After the technical meeting and once confi rma-
                          and Deltatre to install their cables between the   tion form returned, a start list and seeding order
                          room and the track, Photo fi nish camera and HB   was produced for the next events by Deltatre.
                          television OB van.                            Confi rmations Forms were provided for distribu-
                       e)  VDM Operation Area.    is was a working area   tion to the teams through the TIC and CID.
                          overlooking the Long and Triple Jump pits.  3.  Data input and Processing
                       f)  Communications. 30 radios with 5 channels dedi-  4.  Call Room
                          cated to Seiko.                               Deltatre provided a working station for call room
                       g)  Six mobile phones with the ability to make in-  data input which was operated by a technical of-
                   KYEB
                                                                        fi cial and a supervisor from Deltatre. Reprinting
                          ternational calls at the LOC’s cost.
                                                                        of the Technical Start List for judges was available
                       h)  A secure LAN (VLAN) between all the Seiko
                          working areas was installed by LOC.
                                                                        here.
                                                                     5.  Copy of Printouts to the TIC
                       Seiko provided the following during the
                                                                     6.  Daily Program
                                                                     7.  Commentator Information System
                       Championships: -
                                                                        Initially Deltatre were to provide a VMD (Video

                                                                        Measurement of Distance) for Long and Triple
                       a)  Track Transponder System:   A transponder
                                                                        Jump events but after consultation with IAAF it
                          Timing system for in-Stadium races (Long races,
                                                                        was agreed that they provide EDM.
                          fi nals of 800m and over)tubing under the track
                          surface for the installation of the transponder
                          timing loops at the fi nish line and the 200m point
                                                                     Manager.
                          were done by Mondo
                       b)  TV Graphics:     e Seiko signals to the HB which     Lucas Sperotti from Italy was the Deltatre Event
                                                                     Deltatre working team: -
                          was in High Defi nition (HD)
                      KENYA  YEARBO0K
                       c)  False Start: 3 sets of false start equipment, in-
                                                                     1.  Software Manager – Stefano Biagini
                          cluding starting blocks.
                       Deltatre                                      2.  Seeding Manager
                                                                     3.  One CIS/ODF Operator
                       EDITORIAL BOARD
                                                                     4.  One TV Supervisor
                          ey provided the following services:        5.  Five TV Graphic Operators
                                                                     6.  Two Field Supervisors
                       1.  Data Entry and Bib Assignment             7.  One Photo Finish Operator
                          Data entries were downloaded by Deltatre au-  8.  One Scoreboard Operator
                          tomatically from IAAF Database and changes   9.  CIS support / Printing Point support / Call Room
                          were made according to IAAF Competition       support
                          Department.                                10.    ree EDM Operators
                          Entry list was printed with the approval of
                          Competition Department.


















                                                     ACTIVITIES AND OCCURENCES DURING WORLD U18 CHAMPIONSHIPS  | 41
   36   37   38   39   40   41   42   43   44   45   46