Page 253 - World Under 18 Championships
P. 253

IAAF W ORLD U18 REPORT









                               ix)   % of period lapsed     -     100%
                           B)  Scope of Works

                              Soft and hard landscaping works consisting of the following: -
                              i)   Ground preparation to all landscape areas within the main stadium.
                              ii)   Planting of grass
                              iii)   Planting of ground covers, shrubs and trees.
                              iv)   Installation of Wildebeest metal sculptures.
                              v)   Installation of Rock gardens.
                              vi)   Maintenance of the landscape installation works for six months after completion.

                   KYEB
                               C) Status of the Works
                             General status is 100% complete as broken down below.

                               i)   Ground preparation to all landscape areas within the main stadium 100% Complete.
                               ii)   Planting of grass 100% Complete
                               iii)   Planting of ground covers, shrubs and trees 100% Complete.
                               iv)   Installation of Wildebeest metal sculptures 100% Complete.
                               v)   Installation of Rock gardens 100% Complete



                       10. CHALLENGES

                           i)   Works were executed under immense pressure due to urgency and very short contract periods
                           ii)   Working on a site where other operations were ongoing resulted in challenges in dealing with
                      KENYA  YEARBO0K
                               security, logistics and coordination.
                           iii)      e weather was not favorable for the fast growing of planted grass. Importation of water was of
                               essence to curb the situation.
                           iv)   All projects are now under defects liability period and any arising defects will be attended to in
                       EDITORIAL BOARD
                               accordance with the contract.

                       Qs. F. M. King’ori
                       Ag. Chief quantity surveyor




























                                                   ACTIVITIES AND OCCURENCES DURING WORLD U18 CHAMPIONSHIPS  | 253