Page 248 - World Under 18 Championships
P. 248
WORLD U18
6. MOI INTERNATIONAL SPORTS CENTRE, KASARANI – MAIN FIELD – CIVIL WORKS
WP ITEM N0. D113 NB/NB/1601 JOB NO. 10141K
Main Contractor: M/S Newtral Enterprises Limited
P O Box 590-00503
NAIROBI
A) Contract Data
i) Commencement Date - 2nd February 2017
ii) Contract period - 16 weeks
KYEB
iii) Completion date
-
7th June 2017
iv) Revised Completion Date
-
N/A
-
Ksh. 44,650,140
Contract sum
v)
N/A
-
vi) Revised Tender sum
Kshs. 44,650,140.00
-
vii) Amount Certifi ed to date
100%
-
viii) % Funds Certifi ed to date
-
ix) Contract Period
16 weeks
Elapsed contract Period
x)
-
16 weeks
100%
-
xi) % Work done
xii) Contract period elapsed
100%
-
B) Scope of Works
Grotto
KENYA YEARBO0K
i) Wire brushing ,keying and bag washing of the wall
ii) Steel framing of the grotto deck
iii) Chequered plate welded on the steel frame
iv) Two stair case to grotto done
EDITORIAL BOARD
Steel stair done
v)
vi) Deck riveting and stiff ening
vii) Final primer coating
viii) Scabbing of the concrete pavement
ix) Paving slabs: cleaning and replacing of the paving slab
C) Status of Works
General status is 100% complete as broken down below:
GROTTO
i) Wire brushing, keying and bag washing of the wall done
ii) Steel framing of the grotto deck done to 100%
iii) Chequered plate welded on the steel frame to 100%
iv) Two stair cases to grotto done
v) Steel stair done
vi) Paving slabs: cleaning and replacing of the paving slab
248 | ACTIVITIES AND OCCURENCES DURING WORLD U18 CHAMPIONSHIPS