                           B)    Scope of works

                              Upper warm area

                              i)   Excavation of the top layer of grass
                              ii)   Leveling and formation of the fi eld
                              iii)  Top red soil supply and spread
                              iv)  Manure mixed with red soil
                              v)   Culvers for drainage supply and fi xing
                              vi)   Grassing
                  KYEB
                              Lower warm area
                              i)   Excavation of the top layer of grass
                              ii)   Leveling and formation of the fi eld
                              iii)   Top red roil supply and spread
                              iv)   Carpet grass
                              v)   Drainage line
                              vi)   Grassing

                           C)    Works  progress




                              General status is 100% complete as broken down below:
                              Upper warm area
                     KENYA  YEARBO0K
                              i)      e following works have been done on upper warm –up area
                              ii)   Excavation of the top layer of grass
                              iii)  Leveling and formation of the fi eld
                      EDITORIAL BOARD
                              iv)  Top red roil supplied and spread
                              v)   Manure mixed the red soil in progress –is now 100% complete
                              vi)  Culverts for drainage supplied ready for fi xing (the existing drainage levels are maintained ).
                              vii)  Grassing Culverts and construction of inspection chambers done to 100%.

                                 Lower warm area

                                 General status is 100% complete as broken down below:

                              i)   Excavation of the top layer of grass
                              ii)   Leveling and formation of the fi eld
                              iii)  Top red roil supplied and spread
                              iv)  Carpet grass done to 100% and watering done
                              v)   Drainage line opened and repair done
                              vi)  Grassing in progress to 100% complete