Page 241 - World Under 18 Championships
P. 241
IAAF W ORLD U18 REPORT
B) Scope of Works
i) Rehabilitation of Changing Rooms
ii) Tiling of Corridors and External Relaxing Areas (in Eurocon tiles)
iii) Gypsum Ceiling Works in Offi ces and Entry Porches
iv) Concreting the fl oor areas below the terraces
v) Paintworks and General Repair Works
vi) Construction of Equipment Store
C) Status of the Works 100% Complete.
KYEB
General status is 100% complete as broken down below:
a)
Changing Rooms
b)
Tiling of Corridors
100% Complete
Gypsum Ceiling Works
c)
100% complete
d) Concrete Slab below Terraces
and Plastering of Walls
100% Complete.
100% Complete
Paint Works and General Repairs
e)
100% complete
f)
Equipment Store
3. MOI INTERNATIONAL SPORTS CENTRE, KASARANI
– BOREHOLE DRILLING AND EQUIPPING WORKS
WP ITEM N0. D113 NB/NB/1601 JOB NO. 10141E
KENYA YEARBO0K
Main Contractor:
M/ S Pumpken Engineering Company
P.O Box 58835-00200
Nairobi
EDITORIAL BOARD
A) Contract Data
i) Contract Sum
Kshs. 20,608,708.00
-
ii) Commencement Date
-
6th February 2017
iii) Completion Date - 7th June 2017
iv) % Work done
Borehole Drilling - 100%
Borehole Equipping - 100%
v) Amount certifi ed - Kshs 20,608,708.00
vi) % of Amount Certifi ed - 100%
vii) Time Elapsed - 16 weeks
viii) % of period lapsed - 100%
B) Scope of Works
Borehole Drilling
i) Borehole, drilling casing and gravel pack installation
ii) Well development and test pumping
iii) Water testing, chemical analysis and well capping
ACTIVITIES AND OCCURENCES DURING WORLD U18 CHAMPIONSHIPS | 241