Page 65 - LESSONS LEARNED BY MADARFM
P. 65
COMMISSIONING & TESTING
Pre - Handover:
• Building commissioning is the process of verifying, in new
construction, all of the subsystems for: Mechanical
(HVAC), Plumbing, Electrical, Fire/life safety, Building
envelopes, Interior systems, Sustainable systems,
Lighting, Wastewater, Controls, and building security to
achieve the owner's project requirements as intended by
the building owner and as designed by the building
architects and engineers.
Post Occupation (based on time / use):
• Re-commissioning is the methodical process of testing and
adjusting the aforementioned systems in existing buildings.
Black Start – Under Normal Operating Conditions with full services available remove utility (power, water,
chilled water). Reinstate utility and recover full services, noting all anomalies, and creating full and detailed
standard operating procedures.
65