Page 362 - Foton Workshop Manual - Sauvana
P. 362
12B-72 ENGINE MECHANICAL - ENGINE ASSEMBLY
(c). Install the turbocharger assembly and
gaskets, assemble a fixed nut and tighten
it.
(d). Connect the water inlet of turbocharger,
install the hollow bolt ① and fasten it.
Torque : 50N•m
(e). Connect the water return pipe of the
turbocharger, assemble hollow bolt ② and
tighten it.
Torque : 50N•m
(f). Install the thermal baffle of the supercharger,
assemble the fixed bolts and fasten them.
Torque : 22N•m
NOTICE:
In order to facilitate subsequent installation
of machine cold water pipe, do not install the
supercharger left heat insulation plate bolts first.
Page 362