running and then managing the    this interesting work! But nobody in the
                                                  running time of the facility. The initial   surrounding society noticed we were
                                                  idea we envisaged had to be scaled up   even doing it. By that measure, it’s been
                                                  to give us more control and allow more   a success, but the testing itself has been
                                                  testing to be done at the same time. So   a success as well. We have been able to
                                                  that was the whole exercise – a really   do over two years of testing, in a range
                                                  big exercise.                    of conditions that allowed us to simulate
                                                                                   over one hundred years of lifetime for
                                                  DM: One study carried out by Northern   a real installation. It has given us a lot
                                                  Gas Networks took Leeds as an example   of confidence about the way a real pipe
                                                  and built a model to show how we   system – not just the material – will
                                                  could convert Leeds to hydrogen,   behave.
                                                  using this as a basis for changing the   We looked at things like the strength
                                                  UK. Technically, at that time, the gas   of a pipeline, we looked to make sure
                                                  distribution system would have been   that it’s going to be strong enough for
                                                  converted from metal pipes at the   the next hundreds of years – that will be
                                                  end of the 30-year programme during   a big engineering safety factor. We want
                                                  which we have been converting to a   to ensure there’s no possibility of the
                                                  fully welded plastic system with a long   pipe or the fitting system rupturing in
                                                  predictable life and reliability. So, we   an unplanned or uncontrolled manner.
                                                  had all the grounds to think we could   We want to know it’s just going to sit
                                                  put hydrogen into that instead. What   there and behave itself.
                                                  the regulator wanted was an evidential   One thing you need to understand
                                                  approach to say: we believe it’s right,   with polyethylene pipes is that gases
                                                  and we can prove it. At the time we   can permeate through the wall of
                                                  choose to do it, our network will be   polymer structures, so you will get
                                                  mostly made of polyethylene pipe, so   some molecules of hydrogen going
                                                  we would like to have the evidence to   through. It’s not rushing through;
                                                  prove that if we put hydrogen into it,   a molecule might pop through every
                                                  it will be reliable, it will be safe and   once in a while, but hydrogen sits
                                                  ideally it will last for a hundred years   there. Does it change the nature of the
                                                  or more into the future without any   materials to that point that if you impact
                                                  significant risk to society.     it, it might drive a fracture into the
                                                    When we started our investigation,   pipe? So, we’ve explored that too.
                                                  the first thing we had to think about   What can happen in a pressurised
                                                  was what aspects of the lifecycle of   pipeline is, if you drive a fracture and
                                                  a polyethylene pipe are affected by   the pipes are at certain temperature, a
                                   INSIDE THE TESTING FACILITY  hydrogen. That required us to look at   certain material with a pressurised gas
                                                  the design of a series of experiments,   can create a phenomenon known as
                                                  during which we could collect evidence.   rapid crack propagation (RCP). This is
                                                    People believed that hydrogen can   something that we understand as a failing
                 supplying the gas networks; then you   be used with polyethylene and work   mode; it’s something that we test for and
                 have the suppliers of PE pipe, which is   has been carried out in that area over   when you see the test, it’s dramatic. You
                 our side; and you have those that will be   the last 50 years, but it has been done   know, a pipeline can literally unzip
                 making the boilers, heaters and cookers   with a ‘block of material’ and that   within a fraction of a second, and when
                 that would run on hydrogen. There   doesn’t tell you how a pipe will behave.  I say ‘unzip’ I’m talking about hundreds
                 were offers of sponsorships and grants   So, as Simeon mentioned, we worked   of meters, in a rapidly driven crack
                 to carry out research and our bid to do   with lots of oversight from the Health &   through the network.
                 just that was accepted, but we needed   Safety Executive, from subject experts   That’s a phenomenon that’s never
                 to find a testing facility and there were   like Kiwa, and from the emergency   happened in real networks, because we
                 none capable of carrying out hydrogen   services, for example the fire brigade   understand the conditions for it and place
                 testing in the UK.               and other specialist consultants, to   a big safety factor on it. What we have to
                   I had prior experience with hydrogen   ensure we developed a safe and reliable   understand is, if we change the gas, does
                 and when I saw how things were I   system. Certainly everybody who   that become more or less likely?
                 thought, “Okay, we need help from   works in our business noticed that the   The one thing I can tell you for
                 people with more safety experience   facility was running and doing all of   hydrogen – and this was one of the
                 than myself,” so that’s how we ended                              interesting findings – the failure mode
                 up contacting various hydrogen   We looked at things like the     of RCP, which I will say again, we
                 consultants to come in and help us                                don’t have, because we’ve designed
                 bring things together. Once the facility   strength of a pipeline, we   it out – is actually even less likely to
                 was up and running, I was the one   looked to make sure that it’s   happen with hydrogen. The nature of
                 mainly taking care of operations   going to be strong enough for   hydrogen means it just can’t create the
                 like collecting data and making sure   the next hundreds of years –   energy at the crack tip to drive those
                 everything was maintained, putting                                kinds of cracks, so actually, going from
                 in new tests, etc. The challenges were   that will be a big engineering   methane to hydrogen is a safer choice
                 twofold: getting the facility up and   safety factor              in that sense. That was an interesting