Page 15 - AP2464B E-BOOK (KKR2 TOWER)
P. 15

RENEWABLE ENERGY – SOLAR

                                     To reduce carbon emission, energy for building use in partially

                                                   produced from clean solar energy


                                      Total Voltaic capacity installed in the building is

                                      108kWp. Estimated to cover almost 2.5% of the
                                      energy needs of this building. The OV modules

                                           are installed above the car-park roof

    Voltaic Panel installed on
              roof             The PV system both polycrystalline and amorphous silicon

                               type PV panel. Solar Cells should be cleaned minimum

                               twice a year, or whenever a visible layer
                                                                                              Close view Voltaic Panel
                                of dust collected on the panels






                                                  LIGHTING SYSTEM


                                     Emphasis installing energy efficient electric lighting in the building


                                     General office lighting are ceiling suspended pendant

                                     luminaires with electronic ballast and with t5 tubes
                                     installed.


                                Occupancy sensors are installed in the corridors, toilets
                                 and meeting rooms to switch on the lighting only when

           Lighting Sensor                              required

                       There is panel of switches at the office in the morning, the occupant

                       will switch on the lights for the respective corridor areas and some
                       library and office areas away from facade instead of these lights
                                                                                              LED background lighting
                        being   switched on automatically for the whole floor