Page 112 - Eden Meadow 35 houses application as of 12 October
P. 112
Infrastructure Design Limited Page 3
33 The Point Rockingham Road Eden Meadow
Market Harborough Newington
Leicestershire LE16 7QU Infiltration Basin FOS 3
Date 01/09/2020 11:53 Designed by IDL
File INFILTRATION BASIN.SRCX Checked by PT
Micro Drainage Source Control 2017.1.2
Rainfall Details
Rainfall Model FEH
Return Period (years) 10
FEH Rainfall Version 1999
Site Location GB 586400 164600 TQ 86400 64600
C (1km) -0.024
D1 (1km) 0.313
D2 (1km) 0.377
D3 (1km) 0.257
E (1km) 0.313
F (1km) 2.553
Summer Storms Yes
Winter Storms Yes
Cv (Summer) 0.750
Cv (Winter) 0.840
Shortest Storm (mins) 15
Longest Storm (mins) 10080
Climate Change % +40
Time Area Diagram
Total Area (ha) 0.109
Time (mins) Area
From: To: (ha)
0 4 0.109
©1982-2017 XP Solutions