LAND TO THE REAR OF EDEN MEADOWS, NEWINGTON
AIR QUALITY ASSESSMENT
Operational Phase (Traffic Emissions)
Modelled Scenarios
4.7 A modelled baseline year of 2019 has been used. This corresponds with the latest air quality
monitoring undertaken by the Council. A future year has also been chosen (2024)
representing a future year with the proposed development in place and includes changes to
traffic flows due to the proposed and committed development. Overall, four scenarios have
been adopted as part of the assessment. These are as follows:
• Scenario 1 – existing levels of air quality / model verification (2019);
• Scenario 2 – 2024 Do-Minimum (baseline only);
• Scenario 3 – 2024 Do-Something (baseline + proposed development); and
• Scenario 4 – 2024 Do-Something (baseline + proposed & committed developments).
4.8 Scenarios 2, 3 and 4 will be used to determine the potential impact on existing and proposed
receptors adjacent to the modelled road network as a result of increased traffic levels
generated by the proposed and committed developments in 2024. The committed
development flows include the following developments:
• 16/501266/FULL - 99 High Street and Land to the North of High Street, Newington.
Erection on land to the north of 99 High Street of 124 No. dwellings in total including
two storey 2, 3, and 4 bedroom dwellings and 1 and 2 bedroom apartments (2 no. 3
storey blocks) with a new access road from the High Street, pedestrian and cycle link
to Church Lane, formal and informal areas of open space and landscaping, car
parking and amenity space.
• 18/505315/FULL - Land at the Tracies, Newington. Erection of 5 no. detached
houses with associated access and parking including detached carport to Plot 2.
• 16/505861/OUT - Land West to Ellens Place, Boyces Hill, Newington. Outline
Application with access being sought for erection of 9 dwellings with access,
garaging, parking provision and other associated works.
• MC/19/2532 - Land at The Maltings, Rainham. Construction of 29 dwellings
alongside associated parking, access, infrastructure and landscaping works.
• MC/19/2530 - Land at Westmoor Farm (North) Moor Street, Rainham. Construction
of a secondary school with formation of new access from Otterham Quay Lane