Page 111 - Red Book Rev 7.2_Neat
P. 111

6     Solutions   Does the customer require   Please ensure that if installation is
                             Coordinator   installation? If so please speak to a   included that you add
                                        Technical Engineer for prices -   'Installation must be within 1
                                        Photo's/information of site will be   meter of suitable existing services'
                                        required.

                                        If not, refer to step 8
                        7     Solutions   Ask the customer if they have   If so, the customer will need to
                             Coordinator   asbestos in the premises prior to   provide a copy of the asbestos
                                        customer signing the quotation and   survey and notify us if we are likely
                                        drawings.                    to come into contact with asbestos.

                                        Method statements to be done by the   If not, they will need to put in
                                        solution coordinator & engineer who   writing to us to confirm this.
                                        is installing.
                        8     Solutions   Customer must sign the quote,   The customer must agree that the
                             Coordinator   drawing & necessary big job checklists   quotation they are accepting is
                                        and agree to our terms and condition   subject to a final site survey and
                                        before proceeding any further.   any additional works required will
                                                                         be charged accordingly.
                        9     Solutions   Once the quotation/pro forma has   Payment Date 1:
                             Coordinator   been signed we must ask for payment
                                        or if they are leasing the
                                        equipment,the finance company must
                                        be sent the latest revision under
                                        instruction to set up the contract. If Ck   Payment Date 2:
                                        Finance you can follow the below
                                        example structure.
                                        50% Deposit upfront
                                        40% Prior to Installation 1 week prior
                                        10% upon completion (as long as the   Final Payment Date:
                                        10% does not exceed the profit value)
                                        All credit payments are subject to
                                        credit checks.
                                        Customer must sign and agree to the
                                        payment dates & values.

                       10     Solutions   Liaise with the Technical Engineer
                             Coordinator   once the payment is made or when
                                        the lease has been agreed so a service
                                        drawing can be issued. The drawing at
                                        this point will be to scale.
                       11     Solutions   All information must be shared with   Ask the customer if any
                             Coordinator   all relevant contractors involved in the   documentation is required to gain
                                        job (I.e. Builders, electricians and so   access to site.
                                        forth ).
                                        At this point the fabrication drawing
                                        needs to be agreed and signed if
                                        applicable, and any health & safety
                                        forms must be completed. You will
                                        also required to obtain a risk
                                        assessment from the senior engineer.
                       12     Solutions   Delivery and installation dates to be
                            Coordinator/   agreed.
                              Installing   A site survey to be carried out by the
                              Engineer   senior engineer is required prior to
                                        installation to obtain a list of
                                        equipment and spare parts that will
                                        be required.
                       13     Solutions   Email to be sent to Goodsin as per the
                             Coordinator   Goodsin procedure.




                       14     Solutions   Installation Day Liaise with client to   Confirm the installation date
                             Coordinator   make sure no existing equipment   previously agreed with the customer
                                        needs to be removed and check that    is still ok.
                                        all the services are completed


                                                                                                          111 | P a ge