15 Solutions An order itinery must be printed with
Coordinator all the equipment to go on the van at
least 1 week prior to delivery. This
must be clearly marked & it is the
Solution coordinators resposibility to
ensure have arrived at CK.
15a Solutions The van must be loaded the night
Coordinator before installation the Solutions
Coordinator is required to get a copy
of the load sheet to confirm all the
relevant equipment is on the van
ready for delivery.
16 Solutions A box file must be obtained and This must include:
Coordinator loaded on the van for the engineers to Order Itinerary
place all the relevant equipment.
A4 drawing
(To scale if needed - Pack a scale ruler
if req)
Procedures
Risk Assessments
Method Statement
Fabrication Drawings
All relevant contact details roles &
addresses
Elevations
Plans
Service drawings
Sterile Wipes
16 Engineer Engineer to commission equipment Engineers responsibility to level and
once installed. unwrap the units, leaving the top until
last.
Remove all finger marks from the
equipment (Use the sterile wipes in
pack)
Full handover with training.
Produce a snagging list.
The Engineer must advise the
solutions coordinator of this list prior
to leaving site
17 Solutions Courtesy call to be given to customer Go through snagging list if one has
Coordinator been produced and ask if there is
anything else you can help with.
18 Solutions Flowers/Gift and a good luck card
Coordinator would be nice to give to the client
upon whole completion This is the
finishing touch and the customer will
remember you