Page 15 - 3. References
P. 15

REFERENCES  3








            St. Cloud, Minnesota
            WTF SYSTEM IMPROVEMENTS AND CONTROLS UPGRADE



               The control system in the St. Cloud   ultimately required an older operating   a reduction in the communication error
            Water Treatment Facility (WTF)     system to be installed on the new   rate to almost zero occurrences, resulting
            consists of seven programmable logic   computers.                      in a much faster data update rate on the
            controllers (PLCs), two redundant     The services of AE2S were obtained   SCADA system.
            SCADA Server nodes, and six client   to replace the existing communications   Since the Controls System Upgrade
            nodes located throughout the plant.  The   network with an Ethernet network and   project was completed, the City
            WTF was experiencing problems with   to upgrade the operating system to   elected to have a Facility Optimization
            communications between the PLCs    Microsoft XP Professional.  The PLC   Study completed (also performed
            and the SCADA system.  The City of   processors were replaced by processors   by AE2S).  Bench-level laboratory
            St. Cloud had recently purchased new   with Ethernet ports and the Ethernet   tests and SCADA data were used to
            workstation computers, hoping that   network components were set up in a ring   support the development of operational
            the upgraded hardware would solve the   configuration to allow for redundant data   approaches for each treatment process.
            communications issues.  Instead, the new   paths.  The entire WTF stayed running   Implementation of the tools developed in
            operating system was not compatible with   while both the processors and the network   the study resulted in improved treatment,
            the existing communications network and   components were replaced.    process efficiency, energy efficiency, and
                                                  The successful result of this project was   overall treatment process stability.





                                                                                          DATE
                                                                                      2005 - Present
                                                                                                          CLIENT
                                                                                      PROJECT COSTS  City of St. Cloud, MN
                                                                                        $141,800
                                                                                                       CLIENT CONTACT
                                                                                                        Lisa Vollbrecht
                                                                                                    Assistant Public Utilities
                                                                                                          Director
                                                                                                        320-255-7225








                                                                                           KEY PROJECT ELEMENTS
                                                                                           •  Complete System Upgrade
                                                                                           •  Optimization of Multiple
                                                                                             Treatment Processes
                                                                                           •  On-Going Extension of Staff
                                                                                             Support












                                                         AE2S BURNSVILLE TECHNICAL SPECIALTY CONSULTANT ENGINEERING SERVICES SOQ 3.15