            Eden Prairie, Minnesota
            EDEN PRAIRIE WATER DISTRIBUTION SYSTEM

            HYDRAULIC MODEL




            Specific Objectives
               In 2008, Eden Prairie  authorized
            AE2S to develop a calibrated hydraulic
            model of their water distribution system.
            The City wanted a tool to analyze overall
            system performances and to identify
            deficiencies within the existing system
            in relation to pressures and fire flow
            protection.  Operation of water storage
            reservoirs was also a key component to
            better manage the movement of water
            within the system.  The system was able to
            fill some water storage facilities better than
            others, depending on the relative location.

            Detailed Model Development
               AE2S moved forward with the
            development and calibration of the
            hydraulic model by obtaining background
            information from GIS and paper maps   the model.  A working digital copy of the   fluctuations during the summer months.
            of the overall system.  Other information   calibrated model was provided with the   The City of Eden Prairie has come to trust
            was collected on pumping and storage   report.                         and rely on the hydraulic model to help in
            components to develop a framework                                      making responsible decisions regarding
            for the hydraulic model.  Fire flow   Confident Decisions              improvements and operational changes to
            tests were performed at 80 locations      Eden Prairie has used the    the distribution system.
            throughout the system over a three day   hydraulic model to review water system
            period to get a good representation of   improvements, such as the sizing of water
            the system.  Twelve pressure recorders   main for a new complex at the Flying
            were placed at key locations along large   Cloud Airport that needs a certain level   DATE
                                                                                          2007
                                                                                                        CLIENT
            diameter transmission pipelines to gain   of fire protection.  Available fire flow       City of Eden Prairie
            a perspective of the hydraulic grade line   and pressure information was derived   PROJECT COSTS
                                                                                         $48,400
            of the system between the WTP and the   from the model for each existing hydrant         CLIENT CONTACT
                                                                                                       Rick Wahlen
            storage facilities.  SCADA data was also   within the distribution system, which         Manager of Utility
            used to determine hourly system demand   was helpful to the fire department and            Operations
            and to help in calibrating the hydraulic   developers of commercial and industrial        952-294-5908
            model for EPS calibration.  Customer   properties.  The hydraulic model was   KEY PROJECT ELEMENTS
            meter records were geocoded and used to   used to analyze system operations under   •  Development of All-Pipes Model
            allocate demand throughout the system   Extended Period Simulations conditions   •  Fire Flow Testing
            to provide an accurate representation   to determine the most efficient way to   •  EPS Data Collection
            of system demand then.  A calibration   operate storage levels within the system.    •  Geocode Meters and Demand Allocation
            report was completed to document the   The hydraulic model will be used in the   •  Fire Flow Test Calibration
                                                                                   •  EPS Test Calibration
            results of the calibration, as well as provide   near future to determine the location of   •  Water Storage Location
            background information used to set up   new water storage and pumping facility
                                               to help manage large water demand