Page 10 - 3. References
P. 10
REFERENCES 3
Eden Prairie, Minnesota
RILEY CREEK H2-H3 BANK STABILIZATION*
25 feet
High Bank Stabilization stabilization project. He developed a
Riley Creek within the lower valley design to minimize overall impacts to the
is confined to steep valley walls, with little stream corridor while restoring the natural
floodplain available for high flows. Sites habitat of the area. Design elements
H2 and H3 are located downstream of included:
Prospect Road with the bluffs ranging • Rootwads DATE
in height from 80-130 feet. The sites are • Coir roll toe protection 2013 - 2014
considered “high-bank” erosion sites, • Vegetated Reinforced Soil Slope CLIENT
contributing a significant amount of • Willow stakes CONSTRUCTION City of Eden Prairie
COST
sediment to the system and ultimately the • Natural netting erosion control $90,000 CLIENT CONTACT
Minnesota River. Key elements of the blanket Leslie Stovring
design include: • Native vegetation Environmental Coordinator
• Stabilization of 400 feet of stream 952-949-8327
channel
• Repair 2 “high-bank” areas
• H2-20 foot near vertical failure
• H3-25 foot near vertical failure
• Groundwater seepage at the toe of
each failure
Riley Creek H2-H3 Bank Stabilization*
Justin Klabo, PE, CFM, served
as the Project Manager and Designer,
while at a prior firm, for the stream bank
AE2S BURNSVILLE TECHNICAL SPECIALTY CONSULTANT ENGINEERING SERVICES SOQ 3.10