Page 26 - Imagine Clearwater Proposal Digital
P. 26

Jennifer Hofmeister, AICP 100%
PLANNING
Cheryl Callender, PLA 100% LEED Green Associate, SITES AP
LANDSCAPE ARCHITECTURE
Brett Oldford, PE
100%
CIVIL/STORMWATER MANAGEMENT
Robert Anson, PE 25%
MECHANICAL/ELECTRICAL ENGINEERING
Kyle Parks
30%
PUBLIC INVOLVEMENT
Angela Biagi, PLA, LEED AP
Brigitta Shouppe
70%
Harry Portellos, PE
35%
Chris Ricker
35%
Richard Reace, PLA
Michael L. Davis
100%
25%
Tiffany May, PLA, LEED Green Associate
30%
Jason Mihalovits, PLA, LEED AP 100%
ENGINEERING QA/QC
PRINCIPAL IN CHARGE
40%
Bryan Donahue, PLA
PROJECT MANAGER
Tom Mueller, PE
30%
Brian Terry, PLA, LEED AP 100%
PLANNING/LANDSCAPE ARCHITECTURE QA/QC
35%
Jimmy Richie, PE
30%
Sam Hall, PSM
100%
SURVEY
Jennifer Vail, AICP
Kristen Siegel
40%
Adam Schildmeier, PE, LEED AP
30%
30%
Jeff Bergmann, PE 100%
STRUCTURAL ENGINEERING
Christen Hutton, AICP
Christine Crespo Valentin
40%
40%
Tabb Ormsby, LEED Green Associate
40%
Eric Matthews, PSM
35%
Hunter Booth, PLA
20%
LANDSCAPE ARCHITECTURE SUPPORT
Joel Johnson
100%
ENVIRONMENTAL
Rick Rowe, AIA
100%
ARCHITECTURE
Jessica McRory, PE 85%
GEOTECHNICAL
Erik Brueningsen, PE 100%
SUBSURFACE UTILITY ENGINEERING
Jerry Renick, CEP
30%
John Abbott, PG
30%
Rick Harman
40%
25%
Jamie Beatty, PLA
Dave Flanigan
30%
Angela Hendershot, AIA, LEED AP
25%
Juan Ortega, PhD, PE 100%
TRAFFIC ENGINEERING
Chris Stermer
100%
UTILITY COORDINATION
Thomas A. Hammer, AIA, LEED AP
Sydney Dean
25%
25%
= KEY STAFF - RESUMES INCLUDED IN PROPOSAL 00% = EXPECTED AMOUNT OF INVOLVEMENT
Brian LaMotte, PE, LEED AP 100%
WANTMAN GROUP BOOTH DESIGN GROUP  B2 COMMUNICATIONS
ROWE ARCHITECTS AREHNA ENGINEERING
ANSTON-GREENLEES
imagineclearwater DESIGN AND CONSTRUCTION CONSULTING SERVICES 4 qualifications of available staff | page 25


































































































   24   25   26   27   28