Page 4 - Deformation Monitoring
P. 4
DEFORMATION MONITORING The excellence of collaboration
Projects
As one of the most experienced Greek companies in
this sector, an important number of projects have been
completed. Indicative:
MONITORING MICRO-MOVEMENTS OF
TUNNELS:
• Sterna, 900m (twin tubes)
• Neochorio, 700m (twin tubes)
• Artemisio, 1,400m (upgrading the existing single sector
and the construction of the second section)
• Kalogeriko, 600m (twin tubes)
• Rapsomatis, 1,300m (twin tubes) Karistos reinforced earth walls
• Platanos 1,600m (twin tubes)
• Metro Lines 2 & 3 4,500m (twin tubes)
• Platanos Motorway tunnel 2,300m
• Trapeza Railway tunnel, 2,700m
• Tunnels T7 and T8 at Dervenios, 600m (twin tubes)
• ISAP Tunnel between Monastiraki and Omonoia Stations,
660m in length (Subterranean and above-ground)
• Tunnels T1, T2 Corridor X, Demir Kapija – Smokvica,
FYRoMacedonia
• Tirana – Elbasan Motorway, Albania 2,600m in length
(twin tubes) Kassandra gold mines
• Pirot, Serbia, Corridor E80, 600m (twin tubes)
• Gold Line Metro, Doha Qatar, 15,000m (twin tubes)
• ……..
GENERAL MONITORING PLANS:
• Evripos Bridge in Chalkida, 500m
• Ladopotamos Bridge, 150m in length
• Hellenic Gold mines at Kassandra, Chalkidikis
• National Museum of Modern Art at the FIX building
• Reinforced earth at Karysto, 500m in length
• Roof on Olympic Stadium, 400m in length
• Athens Center Mall
• The building complex, Athens
• Slopes along the Egnatia Highway at Peristeri, 500m in
length
• Slopes along the Egnatia Highway at Big Cut 400m in
length
• Parking area at the Polytechnic campus, 4,500m2 in area
• Buildings in landslide in Oropos
• National Modern Art Museum, Athens
• Landslides, Tirana – Elbasan Motorway, Albania
• Landslides, Corridor E80, Bela Palanka, Serbia
• ……. Gold line metro, Doha
4