Page 4 - Deformation Monitoring
P. 4

DEFORMATION MONITORING                                                     The excellence of collaboration





            Projects



            As one of the most experienced Greek companies in
            this sector, an important number of projects have been
            completed. Indicative:
            MONITORING MICRO-MOVEMENTS OF
            TUNNELS:
            • Sterna, 900m (twin tubes)
            • Neochorio, 700m (twin tubes)
            • Artemisio, 1,400m (upgrading the existing single sector
            and the construction of the second section)
            • Kalogeriko, 600m (twin tubes)
            • Rapsomatis, 1,300m (twin tubes)                                               Karistos reinforced earth walls
            • Platanos 1,600m (twin tubes)
            • Metro Lines 2 & 3 4,500m (twin tubes)
            • Platanos Motorway tunnel 2,300m
            • Trapeza Railway tunnel, 2,700m
            • Tunnels T7 and T8 at Dervenios, 600m (twin tubes)
            • ISAP Tunnel between Monastiraki and Omonoia Stations,
            660m in length (Subterranean and above-ground)
            • Tunnels T1, T2 Corridor X, Demir Kapija – Smokvica,
            FYRoMacedonia
            • Tirana – Elbasan Motorway, Albania 2,600m in length
            (twin tubes)                                                                        Kassandra gold mines
            • Pirot, Serbia, Corridor E80, 600m (twin tubes)
            • Gold Line Metro, Doha Qatar, 15,000m (twin tubes)
            • ……..
            GENERAL MONITORING PLANS:
            • Evripos Bridge in Chalkida, 500m
            • Ladopotamos Bridge, 150m in length
            • Hellenic Gold mines at Kassandra, Chalkidikis
            • National Museum of Modern Art at the FIX building
            • Reinforced earth at Karysto, 500m in length
            • Roof on Olympic Stadium, 400m in length
            • Athens Center Mall
            • The building complex, Athens
            • Slopes along the Egnatia Highway at Peristeri, 500m in
            length
            • Slopes along the Egnatia Highway at Big Cut 400m in
            length
            • Parking area at the Polytechnic campus, 4,500m2 in area
            • Buildings in landslide in Oropos
            • National Modern Art Museum, Athens
            • Landslides, Tirana – Elbasan Motorway, Albania
            • Landslides, Corridor E80, Bela Palanka, Serbia
            • …….                                                                                Gold line metro, Doha





             4
   1   2   3   4   5   6   7   8