Page 6 - Deformation Monitoring
P. 6

DEFORMATION MONITORING                                                     The excellence of collaboration


            Geodetical Monitoring system (MSYS)




            WORKFLOW                                             2. LEVELLING MEASUREMENTS
            Moniterra implements an instrumentation and monitoring   A) Buildings – structures within the influence zone
            system (MSYS) that meets all the requirements specified by   Levelling measurements are taken on levelling pins installed
            design. For each section of the works in a project, proposals   at the ground surface (road surface, sidewalks etc.) or on
            are submitted for the setup of the geodetical monitoring system   buildings and/or on deeply embedded rods.
            to the Client .
                                                                 The levelling pins on a surface or on buildings (e.g. vertical
            The following are the minimum requirements to be fulfilled:
                                                                 features, columns and walls) are of the embedment screw
            1. GENERAL REQUIREMENTS                              type of galvanized steel. The installation of the pins are as deep
                                                                 as necessary ensuring that they do not cause any injury to
            For  all  instrumentation  Moniterra  delivers  material  submittal   pedestrians and that they themselves do not get crooked or
            sheets (MSS) to the Client together with calibration certificates   damaged easily.
            and installation details of each instrument. All instruments are
            manufactured by recognised and experienced manufacturers   Alternatively,  where  drilling  and  embedment  is  impossible,
            and comply with the relevant standards.              levelling  contact  pins  are  used  with  an  aluminium  plate  or
                                                                 corner and a steel ball suitably adhered to a hemispherical hole
            When installing instruments, Moniterra informs the Client in   of same diameter.
            writing, via a standard Instrument Installation Announcement
            form at least two days prior to the commencing of installation,   The deep embedment levelling rods are installed inside holes of
            so the Client will be able to witness the installation.  approximately 500 mm depth. They consist of a solid 25 mm
                                                                 diameter fully threaded rod, levelled at its top end transversely
            Moniterra provides all the necessary mechanical and electrical
            protection in order to prevent damage being caused to the   as to its axis. The rod’s lower section is embedded, whilst its
                                                                 upper section has been left free and is protected by a tube
            instruments and ensure the continuity of the monitoring
            program.                                             which will also be embedded and carry a protective, strong
                                                                 cover which will not protrude from the ground surface, capable
            The calibration, maintenance and checks of the instruments   of being removed for measurements and being put back in
            are carried out in accordance with the instructions given by the   place afterwards.
            manufacturer.
                                                                 The measurements of the levelling points are carried out with
            Moniterra provides all the protection measures necessary for   a precision of at least ±1 mm per kilometre and always with
            protection of measuring equipment and the assured resumption   open levelling routings, completely dependent from their two
            of the measuring activity, within two days at the latest following   ends on the levelling starting points (benchmarks) with known
            an eventual damage. Any instrument that undergoes damage   elevation.  These  bases  will  be  installed  with  a  permanent
            is being replaced immediately.                       marker in areas outside the influence zone of works.
            Before the inception of the measurement, all instruments are   The control of the levelling benchmark network is conducted
            checked to ensure correct operation and calibration according   at regular time intervals (of at least three weeks). The results
            to the instructions given by the manufacturer. The checking   of the control of the base network are submitted to the Client.
            and calibration procedures will be carried out throughout the   The  control  measurements  are  carried  out  with  levelling
            operation of the instruments or whenever necessary, and as   instruments having a precision of ±0.3 mm per kilometre. The
            specified by the manufacturer. Moreover, when required, all the   readings are being entered electronically and automatically
            measurements will be adjusted to the environmental conditions   transferred into a processing and entry program in the MDB.
            affecting the instrument and/or the structural element under   The measurement instruments and their accessories (remote
            monitoring (e.g. temperature changes, humidity etc.) each
            time these differ considerably from the normal conditions. The   distance  measurement  devices,  tripods  etc)  are  serviced,
                                                                 checked according to the instructions of the manufacturer and
            maximum length  of distance, from which measurements of
            total displacements (3D) are taken, will be re-determined as   will be replaced when thought necessary by Moniterra.
            less than 100m and according to the existing environmental   B) Ground surface above tunnels
            conditions.
                                                                 Sections and/or grid of pins according to the monitoring design
            The data coming from measuring instruments equipped with   plan are installed. The distance between the pins of each
            an automatic measuring system are transmitted in real time to   section is subject to the design study. On the road pavements,
            the MDB through a cable or wireless system.          the layout varies depending on the actual conditions.

            Surface and Underground Monitoring Networks will be   C) Influence zone free field (in all other cases except the
            absolutely compatible and referred to the Primary and   above)
            Secondary Geodetic Network of the Project.
                                                                 Pins are developed on a grid covering the entire influence zone.
            All  reference  values  (zero  readings)  are  calculated  for  every   Pins that cannot be installed (e.g. in streets with heavy traffic)
            sensor after at least 4 series of measurements.      can be placed and measured at any other location further to
                                                                 pertinent communication with Client.