Page 78 - Manual - Well Fixed Assets and Barcode Asset Checking
P. 78

WELL - FIXED ASSET


                              To check the completion of the Year End process:

                                 1.  Zoom in a certain asset with DP and take a look at Current DP (month) and
               Current Y-T-D (year) whether it shows “0” or not. If the number is shown, that means the system has
               already completed the Year End process.
                                 2.  Look at Y-T-D Accum DP (last year’s accumulated DP value) and compare it
               with Accumulate DP (overall accumulated DP value) to see whether both figures are similar to each
               other or not. If both figures are similar, that means the system has already completed the Year End
               process.

                           9.  Additional Information and Cautions
                              1.  As Well-Fixed Asset is processing, do not run any other program. You are never
               suggested to minimize the program and work on other functions as it may cause error to the program,
               particularly the following figures.

                                 1.1  Cal DP Function
                                 1.2   Month End Function

                                 1.3   GL Function
                                 1.4   Backup Database Function

                                 1.5   Restore Database Function
                                 1.6   Export to Excel Function (As the curser is blinking, you should not click on
               anything showing on the Excel screen.).

                              2.  You should conduct the Year End process after completing “DP -> Month End ->
               GL” of the final month of the accounting year. Many users forget this fact as the Year End process is
               required to be done on a yearly basis.

                              3.  As  you  have  closed  the  GL  and  any  incorrect  information  is  found,  you  are
               required to “Restore” by redoing “DP -> Month End -> GL”. You  need to conduct the backup  of
               information prior to closing the DP.
                              4.  If you want to change Asset Code after the DP calculation is already done, you are
               suggested to go to “Function Asset Entry -> Change Asset Code”. Do not forget to click “Save” to
               save  the  information.  Remember  that  your  new  Asset  Code  should  not  duplicate  any  Asset  Code
               already existed in the program.
                              5.  For  the  “Additional  Information”,  a  user  is  suggested  to  click  “Asset  Entry  ->
               Additional Information” and fill in the required information.