Page 176 - 2019NovemberBOG-reduced
P. 176

This is a view of the condensate drain line for this third floor HVAC system. These drain
                                     lines should be insulated to minimize condensation.






























                    This is a scan of the condensate drain lines. The building code indicates that these lines
                      should be insulated for the first 30” after it leaves the evaporating unit to minimize
                       potential for condensation, which would leak onto the ceiling in the lady’s room.















                                                             38
   171   172   173   174   175   176   177   178   179   180   181