Page 46 - Warehouse 1 to 9
P. 46

46                                                                                                                 47


            6.   Potential sales or other communication opportunities                                                         Procedure for Arranging of goods on dock for counting and  Visual inspection of goods
                                                                                                                              unloaded.
               An ASN can be set up to include an attachment which could contain additional information                       Visual inspection of goods unloaded.
               beside regular information. This may include information about the product or new launches
               and impending shut downs or any other information relevant to the buyer.                                       Quality is important during manufacturing and Supply Chain, whether monitoring the quality of
                                                                                                                              material from the suppliers, checking the quality during the production line or checking the quality
           Summary                                                                                                            before it is delivered to the final customer.

           An Advanced Shipping Notice (ASN) is an important electronic data information tool which keeps                     In case of manufacturing for the raw materials, one area that is very important in the monitoring
           the buyer informed, allows them to track the shipments, allows them to plan for their inventory                    of quality is the inspection of items that arrive at the facility from your suppliers. Ensuring that the
           and helps to improve the relation buyer the supplier and buyer. ASN simple yet powerful tool to                    parts and raw materials are of the correct quality or specifications before the item even enters the
           reduce the customer service efforts and highly recommended for all progressive and professional                    plant is a key aspect of ensuring total quality of the finished goods.
           companies.
                                                                                                                              In case of trading too, the quality of the incoming shipment needs to be checked before it is supplied
                                            ASN READY TO SUBMIT                                                               to the customer to avoid any claims and adverse effect to the relationship with the client.


                                               Supplier Information                                                           Inbound Quality Inspection
            Supplier name                                                                                                     The production or the quality department provides the purchase department the exact specifications
            Supplier email
                                                                                                                              of the products to be purchased. The purchasing department negotiates with the suppliers the best
                                                  Delivery Detail                                                             quality, cost and delivery timelines.
            Carton Quantity                                       Total ASN Units
                                             Advanced Shipping Notification Detail                                            Though in most of the cases, the quality department checks the shipment before it leaves the door
            Order No.  Invoice No.  Product Description  Order   ASN    Inner Pack   Outer Pack  Tolerance                    of the supplier, however, the receiving organization still checks for the quality of the inbound
                                                    Quantity  Quantity   Quantity     Quantity                                shipment in terms of specifications given in the Purchase Order.
                                                    (Units)  (Unites)    (Units)       (Units)
                                                                                                                              The quality department will provide the warehouse with instructions on how to deal with incoming
                                                                                                                              materials. Not all parts incoming shipments need to be inspected. Some low cost standard items
                                                                                                                              may not require inspection at the time of receipt. However, for many items used in the production
                                                                                                                              line, the part or raw material will be subject to inspection.


                                                                                                                              Visual Inspection

                                                                                                                              Material as it is received at the unloading bay, should be first visually inspected for defects or
                                                                                                                              damages. The incoming pallet may be damaged from the side, the received white goods may be
                                                                                                                              dented during transit, the drum carrying chemicals may be leaking. Such items should be rejected
                                                                                                                              immediately on unloading.


                                                                                                                              Packaged items may be rejected if the packaging is damaged. The quality department may have
                                                                                                                              specific instructions for inspection of the packaging to the warehouse depending on the item that is
                                                                                                                              being received.

                                                                                                                              Sampling


                                                                                                                              In case of large quantity of the particular parts or material arrive at the warehouse, not every part
                                                                                                                              need to be checked. The quality department generally instructs to do a random sampling and only
   41   42   43   44   45   46   47   48   49   50   51