Page 9 - QA Candlestick Point Architecture Services Clear Template
P. 9
PROJECT UBER WORLD HEADQUARTERS
MISSION BAY BLOCKS 26 & 27
LOCATION San Francisco, California The project is primarily allocated as office space, including
open office areas for desks, amenities, and multi-purpose
SERVICES Architect of Record spaces. Additionally, city-serving retail spaces are included
Planning & Entitlements Approvals in each building at the ground level and a child care center,
Core & Shell Schematic Design outdoor spaces and public-private landscape areas are
through Construction Observation
designed within the lower levels.
SIZE 480,000 sf
Each of the two buildings feature vertically organized
COST $500 million + (anticipated) “commons” spaces providing for circulation and visual
DURATION 2015 -2019 connection between office spaces and casual space,
putting activities and building program to the exterior on
LEED USGBC LEED-CI Platinum (Pending) display for outside observers. The geometry and materiality
USGBC LEED-NC Platinum (Pending) within each building is calibrated to introduce, direct and
modulate light and shadow creating dynamic spaces visible
CLIENT Alexandria RE & Uber Technologies Inc.
through the transparent glass facades. The facades further
REFERENCE Mr. Carlin Jensen feature operable windows and panels choreographed by
Principal each building’s BMS system to open and close in response
carlin@hitechcm.com to climatic needs within.
408 230 7535
There are three bridges connecting the north and south
buildings. These double-height interconnecting structures
are constructed from custom steel members comprised of
built-up trapezoidal boxes for primary bridge support. The
bridges system has been design engineered such that each
bridge is constructed at the ground level (or roof) and lifted
or erected into place as a componentized unit.
ARCHITECTURE QUALIFICATIONS