Page 9 - QA Candlestick Point Architecture Services Clear Template
P. 9

PROJECT       UBER WORLD HEADQUARTERS
                              MISSION BAY BLOCKS 26 & 27


                LOCATION     San Francisco, California           The project is primarily allocated as office space, including
                                                                 open office areas for desks, amenities, and multi-purpose
                SERVICES     Architect of Record                 spaces. Additionally, city-serving retail spaces are included
                             Planning & Entitlements Approvals   in each building at the ground level and a child care center,
                             Core & Shell Schematic Design       outdoor spaces and public-private landscape areas are
                             through Construction Observation
                                                                 designed within the lower levels.
                     SIZE     480,000 sf
                                                                 Each of the two buildings feature vertically organized
                    COST      $500 million + (anticipated)       “commons” spaces providing for circulation and visual
               DURATION       2015 -2019                         connection between office spaces and casual space,
                                                                 putting activities and building program to the exterior on
                    LEED      USGBC LEED-CI Platinum (Pending)   display for outside observers. The geometry and materiality
                              USGBC LEED-NC Platinum (Pending)   within each building is calibrated to introduce, direct and
                                                                 modulate light and shadow creating dynamic spaces visible
                  CLIENT      Alexandria RE & Uber Technologies Inc.
                                                                 through the transparent glass facades. The facades further
              REFERENCE      Mr. Carlin Jensen                   feature operable windows and panels choreographed by
                             Principal                           each building’s BMS system to open and close in response
                             carlin@hitechcm.com                 to climatic needs within.
                             408 230 7535
                                                                 There are three bridges connecting the north and south
                                                                 buildings. These double-height interconnecting structures
                                                                 are constructed from custom steel members comprised of
                                                                 built-up trapezoidal boxes for primary bridge support. The
                                                                 bridges system has been design engineered such that each
                                                                 bridge is constructed at the ground level (or roof) and lifted
                                                                 or erected into place as a componentized unit.










































                                                                                      ARCHITECTURE QUALIFICATIONS
   4   5   6   7   8   9   10   11   12   13   14