INFRAESTRUTURA



                       INFRAS T R U C T UR E

                       A mobilidade urbana ganhou a requalificação de 65 quilômetros de vias, três
                       terminais de ônibus, 41 plataformas e 200 novos pontos para os passageiros
                       do transporte público.


                       A Copa do Mundo acelerou o processo de implantação da rede de fibra óptica
                       no estado, o que barateou e melhorou a qualidade do acesso à internet. Foram
                       226 quilômetros instalados, além de 708 novas antenas de telefonia.

                       A estrutura de saúde recebeu um centro de operação integrada e um posto
                       médico avançado ao redor da Arena da Amazônia, além de contar com a rede
                       do Samu. Foram registrados 1.394 atendimentos e ocorrências médicas rela-
                       cionadas ao público da Copa.

                       O Centro Integrado de Comando e Controle Regional (CICC-R) coordenou as
                       operações de segurança. Foram R$ 61 milhões na construção e aparelhamento
                       do local, com 2,7 mil metros quadrados de área. O CICC-R tem uma parede
                       de vídeo de 11 metros (videowall) com 36 telões, para onde foram enviadas
                       imagens de 230 câmeras, imagens aéreas de um helicóptero e as informações
           134         dos centros móveis e das Plataformas de Observação Elevadas.

                        The infrastructure in the city was improved. For example, 65 km of roadways
                        were enhanced, as well as bus terminals, 41 platforms and 200 new stops were
                        built for passengers using public transport.

                        The World Cup sped up the process for the implementation of the optical fibre
                        network in the state, which improved the quality of internet access and made it
                        cheaper. In all, 226 kilometres were laid down and 708 new telephone anten-
                        nas were put up.

                        The health related infrastructure was also enhanced with an integrated oper-
                        ation centre and an advanced medical unit in the stadium’s surrounding area.
                        Samu (ambulance service) was also on call. In all, 1,394 medical care services
                        were rendered to people who were there because of the World Cup.

                        The Regional Integrated Command and Control Centre (CICC-R) coordinated
                        security operations. In all, R$ 61 million was invested in building and equipping
                        the place, which covers a 2.7 thousand square metres area. CICC-R has an 11
                        metre video wall with 36 screens, where images from the 230 cameras are
                        forwarded to, in addition to aerial footage taken by a helicopter and information
                        from the mobile centres and elevated observation decks.