Page 959 - Divyank Tyagi
P. 959
|
CERTIFICATIONS, REVIT • collABorAtion (interdiSciPlinAry collABorAtion) 925
stacked walls, 500 collaboration (interdisciplinary collaboration),
stair tools, 636 197–228. See also interoperability; worksharing
Tag Toolset, 767 BIM execution plan and, 217–218
toposurfaces creation Bottom Line, 228, 873–874
from imported CAD data, 93–95, 94 cloud collaboration
®
from placing points, 92–93, 93 Autodesk 360 (A360), 172, 193–195, 339, 470
from points file, 95 rendering in cloud, 469–470, 470
Trim/Extend tools, 81 360.autodesk.com, 193, 194, 339, 470, 873
UI, 19 worksharing, 193–195, 873
walls communication and, 218, 228, 873
creation, Type Properties dialog box, coordinate systems
476, 476 Acquire Coordinates, 204–205
editing wall structures, 478 pinning, 208
modify wall profiles, 497 Project Internal, 202–203, 203
certifications, Revit, 911–918 Publish Coordinates, 204–205
Autodesk Revit Architecture 2015 Certified shared coordinates, 203, 203
Professional Exam, 911, 917–918 coordination process, 198–201
Autodesk Revit Architecture 2015 Certified User Coordination Review tool
Exam, 911, 911–916 Architect to MEP Engineer relationship, 201
chain-select, 66 Architect to Structural Engineer relationship,
Chair Material parameter, 618 201
chairs, detail level, 420, 420 Coordination Review dialog box options,
Changes Not Synchronized dialog box, 181, 181 222–223
Checkout Status tab, 182, 182 exercise, 224
Choose Space Type And Color Scheme dialog box, using, 222–224
131, 131, 825, 825 Copy/Monitor
clash detection. See interference checking Architect to MEP Engineer relationship, 201
Clipboard, copying and pasting, 86–88 Architect to Structural Engineer relationship,
clipped 201
Project Base Point, 207–208 defined, 199–200
Survey Point, 208 exercise, 220–222
Close Project Without Saving dialog box, 186, 186 grids and, 874
cloud collaboration overview, 874
®
Autodesk 360 (A360), 172, 193–195, 339, 470 using, 218–222
rendering in cloud, 469–470, 470 floors, 541
360.autodesk.com, 193, 194, 339, 470, 873 interference checking (clash detection)
worksharing, 193–195 defined, 200
CMUs (concrete masonry units), 125, 485, 487–488 exercise, 227, 228
Coarse detail level, 419 how to use, 874
Coarse Scale Fill Pattern, 477, 478 Interference Check tool, 200, 226
COBie (Construction-Operations Building IU BIM Standards & Guidelines for
Information Exchange), 6, 261 Architects, Engineers, & Contractors, 200
Collaborate tab. See also Synchronize With Central; Level One clashes, 200, 225
worksharing Level Three clashes, 200, 226
Active Workset drop-down, 178, 178, 179 Level Two clashes, 200, 225
described, 23 purpose, 874
Gray Inactive Worksets button, 179 Structural Engineer to Architect relationship,
Synchronize With Central button, 167 201
Worksets button, 164, 173, 872 Structural Engineer to MEP relationship, 201
worksharing tools, 163, 163 using, 225–228
bindex.indd 925 05-05-2014 16:28:37

