Page 963 - Divyank Tyagi
P. 963
|
curveS • deSiGn oPtionS tAB 929
Mullions option, 513 Default Wrapping, 481, 483, 483–485, 484, 485
pinned, 513–514 Delete Elements, Coordination Review dialog
replacing, 506, 506–507 box, 223
system families, 476 deleting
storefront wall, 511–513, 512 area objects, 726
subcomponents, 503–504 Delete Inner Segment option, 82, 82
system families, 476 design option sets, 399, 401
curves design options, 399, 402
BIM curve, 229, 230 line patterns, 113
complex surface in Rhino, 244 line styles, 115
MacLeamy Curve, 13, 13 pinned elements, 84
surface masses, 285 unused CAD data, 891
custom annotations, 141–150, 157, 871 Demolition hammer, 373
custom complex fill patterns, 126–130, 157, 871 Demolition phase, 368
custom curtain panels, 514, 514–515, 515 design analysis. See massing; sustainable design
custom door tag, 143, 143–146, 144, 145 analysis
custom elevation tags, 149, 149–150, 150 design option sets
custom floor edge, 547–550, 548, 549, 550 Add To Design Option Set dialog box, 397
custom in-place walls, 499, 499–500 deleting, 399, 401
custom material libraries, 122 tenant exercise, 407, 408, 413, 414, 415
custom railings, 670, 670–674, 671, 672, 673, 674 design options, 394–402. See also groups; phasing
custom section tags, 146, 146–149, 147, 149 accept primary design option, 399–401
Customize Double-Click Settings dialog box, 90 best practices, 878
customized model elements, 677 Bottom Line, 416, 878
customizing color fill legends, 828, 828–830, configuring, 394
829, 830 creating, 395–397
customizing dimension text, 774–776, 775, 776 deleting, 399
customizing stairs, 642–644 Edit Option mode, 397–398, 398
cut in section, family categories, 576–577 editing, 397–398
cut patterns hosted elements with hosts, 416, 878
defined, 124 introduction, 394
drafting patterns, 117, 125, 126, 128, 694, 695 iteration of, 363
Graphics tab, 117, 118 main model, 394
cut values, 579 multistory tower, 416, 878
cut/fill schedules, 103–104, 154 preserving (Real World Scenario), 401
Cutoff Level, roof instance property, 556 scheduling, 398–399
Cutoff Offset, 556 tenant exercise, 402–416
Design Options tool, 413, 413–415, 414, 415
existing floor plan, 403
D Phase 1: Demolition, 404, 404–405, 405
datum objects (relationships), 36–47. See also grids; Phase 1: Proposed, 405–406, 406
levels; reference planes Phase 2: Demolition, 407, 407–408, 408
creating, 37 Phase 2: Proposed, 408–409, 409
diagram, 36 scheduling, 410–413, 411, 412, 413
in groups, 392 views, 398–399
in project organizational chart, 35, 35 walls, 395, 395–396, 396
relationships and, 34, 870 workflow, 394
David Baldacchino’s blog, 169 Design Options dialog box, 395–396, 399, 401, 402,
DDS-CAD Open BIM Viewer, 261 413, 413
Default 3D view, 59 Design Options tab, 394, 398, 398–399, 414
bindex.indd 929 05-05-2014 16:28:38

