Page 961 - Divyank Tyagi
P. 961
|
concePtuAl mASS • coordinAtion monitor toolS 927
location and weather station, 341, 341 merging, 816
refining conceptual analysis, 349 modifying, 810–813, 811, 812, 813
Green Building Studio , 23, 339, 345 Parts Category, 817
®
Real World Scenario, 349 scheduling, 817, 817, 818
refining, 349–356 using, 814
setup, 340–345 revision clouds, 797–803
simulations, 345–348 creating, 797–800, 798, 799
Subscription Advantage Pack, 339 drawing mode, 797
conceptual mass. See also twisting tower massing placing, 800–802, 801
form tagging, 802, 802
adaptive component, 327–333 revisions
insert adaptive component in mass family, on drawing sheet, 821, 886
336–338 introduction, 797
mass family creation, 333–338 in live model, 799
Bottom Line, 362, 876 construction sequencing, 363–364, 365, 416, 809, 877
overview, 326 Construction-Operations Building Information
Conceptual mass panel, 242, 276, 312 Exchange. See COBie
conceptual tower mass. See twisting tower massing consultants. See collaboration
form content (repetition). See also family components;
Conceptual-Mass-Finished.rfa, c09, 340 parameters; system families
concrete masonry units. See CMUs in project organizational chart, 35, 35
ConDoc system, 754 repetition and, 34, 47, 870
conference room exercise spaces and, 48
artificial lighting, 461–462 content guidelines and standards, 574–575. See also
assigning materials, 468–469, 469 families
lighting, 460–461 context menu, 70, 70
RENDER - CONFERENCE ROOM, 460, 464 contextual tabs, 23–24, 24
Consistent Colors view style, 424, 424 contextual text formatting, 752–754, 753
Constrain option, Move tool, 73 Conversion-Start.rvt, c07, 238
constraints, 84–85, 85 Coordinate System Basis, 203, 255, 257
Construction category, top rail type properties, 631 coordinate systems
construction phase, 797–821 Acquire Coordinates, 204–205
Bottom Line, 821, 886–887 pinning, 208
builder’s approach, 797, 808–820 Project Internal, 202–203, 203
design team’s approach, 797–808 Publish Coordinates, 204–205
digital markups, 803–808 shared coordinates, 203, 203
exporting DWFx files, 804, 804–805, 805 UVW, 516, 519
importing, 806, 806–808, 807, 808 Coordination Monitor tools, 217–228
introduction, 803 Copy/Monitor
publishing to Design Review, 803 Architect to MEP Engineer relationship, 201
modeling for construction, 808–820 Architect to Structural Engineer relationship,
assemblies, 818–820, 819, 820, 886–887 201
assembly views, 818–820, 819, 820 defined, 199–200
introduction, 808–809 exercise, 220–222
parts, 809–818 grids and, 874
Bottom Line, 821, 886–887 overview, 874
creating, 809–810, 810 using, 218–222
defined, 809 interference checking (clash detection)
dividing parts with gap, 814, 814–816, 815 defined, 200
excluding, 816 exercise, 227, 228
bindex.indd 927 05-05-2014 16:28:37

