Page 87 - Critical Control flipbook_Neat
P. 87

Structural Collapse











           1    What is the name of           2    What are its specific objectives related to the Priority Unwanted
                                                   Event (PUE)?
                the critical control for
                Structural Collapse?
          Structural Protection              Protect structures from accelerated degradation or from accidental impact; and reinforce
                                             weakened structures


           3    What are the critical         4    What are the activities       5    What can be sampled from
                control performance
                                                   within the management
                                                                                      the set of activities for
                requirements to meet the           systems that support               verification, providing a
                objectives?                        having the critical control        clear image of the critical
                                                   able to do what is required?       control status?
          Physical barriers to protect structures   Traffic Management Planning includes   Review structures potentially affected by
          from foreseeable impact of mobile   potential risk areas for contact  mobile equipment have barriers in place
          equipment or heavy objects

          Adequate protection/treatment for   Structural Integrity annual Inspections   Review inspection and assessment
          corrosion and/or abrasion of critical   and Assessment identify damage and   records
          structures (hoppers, bins, ducts, structural   wear conditions requiring attention  Review action completion
          elements)

          Reinforcement and repair of weakened   Structural Integrity annual Inspections   Review inspection and assessment
          structures                         and Assessment identify damage and   records
                                             wear conditions requiring attention  Review action completion


           6    What is the target performance for critical     7    What is the critical control performance
                                                                     trigger for shutdown, critical control review or
                control?
                                                                     investigation?
          Structures that are damaged/degraded/corroded receive   Failure to implement corrective action for a structure at risk
          adequate protection/reinforcement


































          Creation date: 01/2021 • The latest and only controlled version of this document is available on the HSE intranet.
          © 2021 Holcim - For internal use only
   82   83   84   85   86   87   88   89   90   91   92