Structural Collapse











           1    What is the name of           2    What are its specific objectives related to the Priority Unwanted
                the critical control for
                                                   Event (PUE)?
                Structural Collapse?
          Preventive Maintenance and Inspection  Detect and address degradation of structural elements and material spills potentially
                                             affecting them


           3    What are the critical         4    What are the activities       5    What can be sampled from
                control performance
                                                   within the management
                                                                                      the set of activities for
                requirements to meet the           systems that support               verification, providing a
                objectives?                        having the critical control        clear image of the critical
                                                   able to do what is required?       control status?
          Routine housekeeping and cleaning   Housekeeping program with areas   Housekeeping frequencies,
          allow inspections and prevent blockage   defined and routinely monitored for   accountabilities and records of ongoing
          of sliding connections and/or structural   build-up, leaks, spillage, emphasis on key   execution
          overloads (roofs and platforms)    areas

          Inspection of structural elements   Annual inspection and assessment of   Review records of annual inspection;
          Including sliding connections/joints,   steel and concrete structures  confirm all structures are inspected
          working platforms and elevated walkways

          Periodic thickness measurements of   Thickness monitoring process in place  Review records and follow up actions on
          bins/hoppers/silos/ducts and structural                               cross section thickness at risk
          elements
          Cross section thickness reduction of
          structural elements shall not exceed 25%

          Structures at risk are formally identified   Annual assessment with action plan  Review of high risks from inspection
          and assessed by a competent person   Expert assessment (for Level 1 risks) with   records and related expert reports
          and corrective actions are defined and   action plan                  Verify actions being addressed
          implemented

           6    What is the target performance for critical     7    What is the critical control performance
                control?
                                                                     trigger for shutdown, critical control review or
                                                                     investigation?
          Structural degradation detected and prevented        Significant material accumulation affecting structural elements.
                                                               Structural elements exceed 25% loss of cross section.
                                                               Annual inspections/assessments not completed
























          Creation date: 01/2021 • The latest and only controlled version of this document is available on the HSE intranet.